Current Assignments

Techno-Legal service / Retainership with private sector

  • Four laning of Aurangabad Paithan section of NH-752E from existing km. 0.000 (Design Km (-) 1.800) to existing km. 44.400 (design km.42.417) (design length 42.217) in the state of Maharashtra to be executed on EPC mode under Bharatmala Pariyojana.
  • Swarna Projects Ltd., Hyderabad for their various projects in the State of Madhya Pradesh with MPRRDA.
  • Malaxmi Highway Pvt Ltd., Concessionaire for NS-1/BOT/MP-2 in the State of Madhya Pradesh.
  • Personal services to Project Heads for an EPC /HAM works of Construction of Eight lane Access Controlled Expressway Carriageway for package / section of Delhi Vadodara Mumbai Greenfield Alignment in the State of Madhya Pradesh & Gujarat

Completed Assignments

  • Provided service to AZB & Partners AZB & Partners AZB & Partners (One of top 10 Legal firm in India) for carrying Due Diligence Report against projected FDI by an American investment firm to take over five projects from Concessionaire. Work covered with review of the correspondence exchanged with the State Authority / IE / NHAI until date and provided an issue-based report in terms of all monetary and non-monetary liabilities / claims etc.

a.   Four laning of Sambalpur Baragarh Orissa/Chatisgarh Border section of NH-6 from Km.0.00 to Km. 88.00 in the State of Orissa to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase -III.

b.   Design, Engineering, Finance, Construction, Operation and Maintenance of End of Durg Bypass – Chattisgarh / Maharashtra section from Km.322.400 to Km.405.000 of NH-6 under NHDP phase-IIIA on Build, Operate and Transfer (BOT) basis.

c.    Six laning of Dhankuni – Kharagpur section of NH-6 from Km.17.60 to Km. 129.00 in the State of West Bengal to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase -V.

d.   Design, Engineering, Finance, Construction, Operation and Maintenance of Chattisgarh / Maharashtra Border-Vainganga Bridge section from Km.405.000 to 485.000 of NH-6 in the State of Maharashtra under NHDP phase-IIIA on Build, Operate and Transfer (BOT) basis.

e.   Six laning of Belgaum — Dharwad section of NH-4 from km 433.00 to km 515.00 (Length — 79.36 Km) in the state of Karnataka to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase — V (Package No.: NHDP — V/MC-II/19).

  • Construction of Katora to Selda (Plant) Road works of NTPC in the State of Madhya Pradesh for R.K. Sancheti Constructions, Nagpur
  • Malaxmi Highway Pvt Ltd., Concessionaire for NS-1/BOT/MP-2 in the State of Madhya Pradesh with Promoter M/s. Meenakshi Infrastructure Pvt. Ltd., Hyderabad. (4-Laning of km 547.400 to km 596.750 on NH-7 (Lakhnadon-Seoni section) in the State of Madhya Pradesh under NHDP Phase II on BOT (Annuity) basis).
  • R.N. Constructions, Hyderabad for Construction of ROB with approaches at Railway km.219/900-220/000, road Chainage 44+855 on Channagiri-Birur road (LC No.133 Between Birur Station-Nagavangala Station on Birur Junction-Chikjajur section of Mysore Division (Contract No. KSHIP-II/STAGE-II/NCB/ROB2). An ADB funded FIDIC based project. Duration: – January-2015 to Feb-2016.
  • BG Neemrana Rewari Linkway Pvt. Ltd, a PPP in State Highways -111, Gadoj to PWD-Rajasthan for Brij Gopal Construction Company Private Limited, ROHINI, Delhi.